Integration steps
Configure
Hardware assembled to the agreed bill of materials; BIOS, BMC and firmware set to a documented baseline.
Rack & stack
Servers, storage, switches and PDUs installed to approved rack elevations.
Cable
Power and data cabling routed, dressed and labeled at both ends.
Burn-in & test
Stress testing to catch early-life failures and dead-on-arrival parts before shipment.
Document
Serial numbers, asset tags, port maps and as-built rack diagrams handed over with the equipment.
Delivery options
- Node-level. Individually configured and tested systems for your team to install.
- Rack-integrated. Fully built racks shipped as a unit, quoted per project.
- On-site installation. Installation and cabling at your facility, coordinated with your staff.
Why it matters
- Faster time from delivery to production.
- Fewer failures in the first weeks of operation.
- Every unit in the fleet configured the same way.
- Records ready for asset management and warranty claims.